CHANGING THE CURRENT
Panther Island presents a rare opportunity to help build a new piece of Fort Worth from the ground up.
With more than 300 acres of public and private land in the city’s urban core, the district pairs significant infrastructure investment with a long-term vision for mixed-use development designed to respond to Fort Worth’s continued growth.
334 ACRES
Mixed-Use Development
192 ACRES
Developable Land
51 ACRES
Open Space
3 ACRES
Planned Central Park
Picture Panther Island
Defined as much by its waterways as the experiences offered, Panther Island will become a landmark woven into the city’s identity for generations to come.
Land Ownership
- TRWD
- Tarrant County
- Private Ownership
- City of Fort Worth
- TCCD
- Oncor
Developer Tools
Explore key resources and guidance for planning, designing, and developing within Panther Island.
Planning + Design
Form-Based Zoning
Standards and Guidelines
Engineering + Infrastructure
Development Process
Panther Island Form-Based Code
The 2026 Form-Based Code establishes standards and guidelines to ensure high-quality development and reduce impediments to developers. Key improvements include:
- Simplification of the zones;
- Alignment with Canal System Manual to clarify public waterfront standards versus streetscape and private developer requirements;
- Establishment of regulating plan with street sections and frontage standards to focus commercial activity;
- Expansion of the ranges for minimum and maximum building heights;
- Greater administrative authority to facilitate development challenges;
- Realistic building standards
The Panther Island Form-Based Code was originally adopted to codify the original Trinity Uptown/Panther Island Plan that was published in 2004. While evolving over time, the City Council adopted an update in 2026 to reflect the community-led development of Panther Island Vision 2.0. The new Vision emphasized mixed-use development, walkability, interconnected greenspace, connections to neighboring districts, and continuous waterfront access.
The City of Fort Worth and Tarrant Regional Water District will be working hand-in-hand to facilitate the developer experience.
Panther Island Canal System Manual
The Canal System Manual was adopted by the TRWD Board in 2025. The purpose of the manual is to provide:
- Technical and engineering requirements for the Canal System;
- Standards and Guidelines for Paseo design and landscaping;
- Framework for TWRD, City and Public Improvement District maintenance and operations responsibilities;
- General processes for review and inspection
The Canal System Manual below works in tandem with the City of Fort Worth Panther Island Form Based Code that governs the streetscapes and private development abutting the Canal System.
Canal Connection Fee
TRWD adopted a Canal Connection Fee on January 20, 2026, to fund a portion of the construction of the Canal System. All developers are subject to the fee regardless of canal adjacency since the Canal System provides drainage for the entire island. The fee is calculated in two parts, for the canal basin and the paseo, based on square foot rates for the area being developed. The rates represent 40% of the estimated cost of system construction in 2025 dollars and will be updated periodically. Credits may be available for developers who are constructing portions of the Paseo.
The Canal Connection Fee worksheet below provides instructions for estimating the fee for your property and submittal requirements.
Canal System Manual
The Canal System Manual was adopted by the TRWD Board in 2025. The purpose of the manual is to provide:
- Technical and engineering requirements for the Canal System;
- Standards and Guidelines for Paseo design and landscaping;
- Framework for TRWD, City and Public Improvement District maintenance and operations responsibilities;
- General processes for review and inspection
The Canal System Manual below works in tandem with the City of Fort Worth Panther Island Form-Based Code that governs the streetscapes and private development abutting the Canal System.
Get in Touch
Complete the form to connect with our development team.
TRWD Water Quality Guidance Manual
The goal of the TRWD Water Quality Guidance Manual is to promote effective, useful guidance in cost-effectively planning, designing and implementing stormwater infrastructure that will protect the Trinity River and its tributaries from the negative impacts of urban runoff.
Panther Island Drainage Studies
A critical component for private development on Panther Island is the proposed canal system, which functions as stormwater detention and floodwater protection. Tarrant Regional Water District (TRWD) has identified canal improvements that will provide the necessary canal system for initial private development. Drainage Study (DS-25-0127) for Panther Island Canals B Ph II, C PII & D Ph II was approved by the City on February 12, 2026. This approved drainage study also included a Panther Island Storm Drain Appendix, which provides additional guidance for private development drainage study submittals.
All developments on Panther Island will be required to submit a separate drainage study to support their individual development project in accordance with DS-25-0127 and City of Fort Worth criteria. For additional information, please contact SDS@fortworthtexas.gov.
*After accepting the disclaimer search for Panther Island Canals
Panther Island Developer Regulations
TRWD adopted Developer Regulations in 2026 to define the responsibilities of developers who may construct public infrastructure (canals and/or paseos) to serve their development projects. The Regulations also describe instances when developers may enter into Future Improvement Agreements with TRWD.
Interested In Panther Island?
Connect with the Panther Island team to learn more about development opportunities, available resources, and project updates.